Assets & Site Layout
An asset type is the kind of thing BayWise Inspect checks, such as a pickup or a trailer. A characteristic is a detail you record about it, such as make or colour. Site layout is where those things physically sit: the zones and rows your team walks through.
A checklist’s conditions set which vehicles it covers. They can use characteristics and, where you have drawn one, the site layout.
Asset types
An asset type names a kind of vehicle. You add types and characteristics in Set up, under Vehicle types & characteristics. Each characteristic has its own kind of value: one of a list you define (a fuel type, say — petrol, diesel, electric), free text, a number, or a date. A characteristic belongs to your whole organisation, not to one type. Once you add it, every checklist can match on it. Vehicles have no value for it until one is recorded.
A type also carries an icon, chosen from a small set of vehicle shapes. It shows next to the type in the list, so with more than one or two types you can tell a truck from a van at a glance.
Adding a type does not put any vehicles in it. Vehicles get their type from your import file.
At a vehicle yard run by a four-site authorised dealer network in the Gulf, the Inspection Supervisor defined a single “Vehicle” asset type, with make, model, and a shipping reference as characteristics. That is enough to identify anything that arrives by ship, rail or truck. A shipment can contain cars, vans and the occasional piece of construction equipment, and one characteristic for the category tells them apart without a second type.
Site layout
Site layout describes where the vehicles you inspect are held. You draw it in Set up, under Site layout. It is part of the yard set-up; the dealership pre-delivery and generic set-ups do not have it (see Settings & Terminology). Within a site, layout breaks down into zones, and each zone into rows. You say how many rows a zone has and how many positions are in each row, and the layout is drawn from that. The drawing screen calls a position a slot; everywhere else it is a space. You can rename the word for the zone and for the place itself (Zone, Area, Yard, Lot) under Wording in Preferences.
Site layout lets a checklist apply to a place rather than one vehicle at a time. “Every vehicle in Zone 3” is one rule that keeps working as vehicles move through it; naming each vehicle individually is a list that goes stale the moment something moves. This works once your vehicles have a recorded position.
The same network runs its Dubai vehicle yard on the yard set-up and lays it out as several zones (arrival, prep, final check), matching the checkpoints a vehicle passes through before reaching a customer. A checklist assigned to the prep zone applies to whatever is standing there on a given day, not to a fixed list of vehicles decided in advance. When the Inspection Supervisor needs to add capacity for a busy month, they add rows to the prep zone rather than reconfiguring every checklist that references it.
The yard map
Once you have drawn zones, the Yard tab shows them as a map: every space is a numbered square, grouped by zone and row. The header line counts what is on the map today, for example how many spaces are occupied, and how many vehicles are inspected, due or overdue. Until a vehicle has been placed it says how many spaces are drawn instead. The Vehicles list has its own map view, described in Vehicles and the Vehicle Page. It uses the same colours and squares, but sits inside the list, is titled Where the work is, and follows the list’s zone filter.
Each square is coloured to show what is standing there today:
| Colour label | What it means |
|---|---|
| Inspected today | The vehicle in the space has had an inspection completed today. |
| Due today | It has an inspection due today, or one that is scheduled, in progress or put back. |
| Overdue | It has an inspection that is overdue or was missed. |
| Parked, nothing due today | A vehicle is there and nothing is due for it today. |
| Empty | Someone recorded that the space is empty. |
| Not known | Nobody has recorded anything for the space. |
A few rules decide the colour:
- The worst colour wins. A vehicle that owes several inspections takes the colour of the most urgent one: overdue, then due, then inspected.
- Nothing due does not mean inspected. A vehicle with no inspection due today stays “Parked, nothing due today”. It is never shown as inspected.
- Waived and cancelled inspections are ignored.
- Empty and Not known are different. “Empty” says the space is clear. “Not known” says nobody has recorded a vehicle there, so a newly drawn yard is all “Not known”, not all empty.
A space is coloured only once a vehicle’s position is recorded. Record it on the vehicle’s record with Move (choose the zone, row and space, then Move it here), or give the space in an import file. Point at a square to see its number and the vehicle’s registration. Select it to open that vehicle’s record.
Each zone and row also shows where it is on the ground, as coordinates learned from where inspections are done. A row reads Rough for a first estimate and Settled once enough inspections agree. A zone or row with nothing learned yet reads No position yet.
Colours come from today’s inspections at the site you are looking at. If your role can’t see inspections, vehicles show as “Parked, nothing due today”. The map appears only for a site with a drawn layout, and only in the yard set-up.
How they work together
Characteristics and site layout are independent of each other. You can use one without the other. When you decide which vehicles a checklist covers, you choose All vehicles, or Only some vehicles with one or more conditions: a characteristic such as make, or a place such as site, zone or row. A checklist can apply to “every vehicle, anywhere” or to “anything in Zone 3.”
This lets one organisation run different operations side by side. A dealer network with both a pre-owned yard and a new-vehicle prep line adds one more characteristic value, or one more zone, inside the same account. It does not need a second product or a second setup.